Building permit — Addition / Alteration · DB-2022-04406
Field Review - Addition / Alteration - Exterior alterations to remove existing HRV and replace with new electric HRC with heat pump on the roof, roof replaced with new roof drainage and safety anchors and all deteriorated wood framing will be removed and replaced to match existing look and feel; and repairs to the roof spire at this existing municipally designated heritage B mixed use building at this site. Okay for Field Review per A. Cashato Letters of assurance submitted: Sch A/B (Mech, Plumb)): Steven Felterly, P.Eng., 604.339.2650 Sch B/D (Arch - Envelope): Kelsey Van Steele, P.Eng., 604.738.0048 Sch B (Struct): Leonard Pianalto, P.Eng., 604.738.0048 Sch B (Elect): M Khan, P.Eng., 236.999.1882 Note: - A notification letter shall be sent to the tenants before any work. A copy of the notification letter shall be submitted to the Supportive Housing review group at the City of Vancouver before the construction. - Interior alterations are limited to removing and replacing with new domestic hot water in the basement. - Energy upgrade: E2 - HVAC - Clean and Balance all Air Systems (per 6.7.2.3.2 of ASHRAE 90.1-2016)
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.