Building permit — Addition / Alteration · BP-2021-06113
Field Review - Addition / Alteration - Unit #409 Interior alterations to provide tenant improvements in Unit 409 on the 4th floor in this existing Multiple Dwelling Building on this existing site. Scope of Work : Removing partition walls, cabinets, flooring, countertops, appliances and pot lights. Cosmetic changes to the Master and Main Bathroom. Existing balcony enclosure to be removed and restored back to original open balcony. Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.