Building permit — Addition / Alteration · BP-2022-00440
Field Review - Addition / Alteration - Interior alterations to provide improvements to this existing Vancouver registered Heritage "B" , retail, office & rooming house building on this site. Scope of work: bathroom repairs on second (224 *see Rev #1) and third (334 *see Rev #1) floor. Supply and install subfloor, insulation, vapor barrier, drywall, fire caulking, shower surround and trims and finishes. To repair fire rated assembly between the 1st and 2nd, and 2nd and 3rd floors. REVISION #1: to correct the numbers in the above Scope of Work. Bathroom 224 on the second floor should be 229 and Bathroom 334 on the third floor should be 324 as per Building Inspector A. Cashato. Feb 6, 2023 mlh OK for field review as per Adrian Cashato - January 19, 2022 Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.