Building permit — Addition / Alteration · BP-2021-06827
Field Review - Addition / Alteration - Floor Level 1 Interior alterations to this general office on the 1st floor in this existing mixed-use building on this site. Scope of work: reconfiguring interior walls and adding new pot lights. REVISION #1: install four (4) structural posts and supporting beams at the ceiling in new shared office #2, to provide a wing wall at the single sink and to add a 'L' shaped wall with a single sink in a counter in the open workspace 3 area. Project value increasing from $250,000 to $266,000. Aug 9, 2022 mlh TENANT: Easter Seals House Structural Schedule B submitted by Sal Tabet, P.Eng., Struct. Eng., ph: 778-836-7221 OK for Field Review per K. Kang, December, 22, 2021 NOTE: This building is sprinklered. DBI to determine on site if a separate sprinkler permit is required. Energy upgrade - E2 - Lighting - Upgrade to incorporate Automatic Partial OFF (per 9.4.1.1.(g) of ASHRAE 90.1-2016)\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.