Building permit — Addition / Alteration · BP-2022-00388
Field Review - Addition / Alteration - Interior alterations to renovate this existing one family dwelling with a secondary suite on this site. Scope of work includes the removal of an interior partition wall between the kitchen and dining room and new insulation in the roof and sections of the main floor. REVISION #1: To remove an interior wall between the dining room and hallway. B.Wong June 21/22 REVISION #2: REVISION #2: - Replacing exterior windows and doors - Replacing interior doors on the upper level - Add type X GWB to the laundry room - Revised REUP points B.Wong Dec 15/22 OK for field review as per Jamie Zhang, Jan.27/22. Notes: - This building is not sprinklered. - DBI to determine on site if Schedule B, Structural is required. - REUP Submitted by Doug Martin, 604-614-7985. Scope of work to include energy upgrade in accordance with Article 11.2.1.4 of the 2019 Vancouver Building By-law and as per the Energy Efficiency Upgrade Details noted in the Energuide Report. *Selected Upgrades: air sealing, upgrade to R40 attic insulation, insulate exposed floors with R-22, decommission a fuel-based appliance, replace 2 exterior doors, ventilation controls in all bathrooms.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.