Building permit — Addition / Alteration · BP-2022-01989
Field Review - Addition / Alteration - #220 - 2nd Floor CF-2022-002581 Interior alterations to validate WWOP improvements to this existing dwelling unit on the 2nd floor (#220) in this existing multiple dwelling building on the site. Scope of work to include: remove non-loadbearing wall between kitchen and dining room, new millwork and flooring, new bathroom fixtures, pot lights, electrical and plumbing work to suit. Letter of Assurance submitted by: Phil Miller - P.Eng - 778.828.0161 Okay for Field Review by Kim Vogt Building Not Sprinklered - No sprinkler inspection or permit required E2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.