Project · Public

Building permit — Addition / Alteration — 3866 W 35TH AVENUE, Vancouver, BC V6N 2N9

Source: Vancouver — Issued permits — 2023-2025

Enquiry Centre - Addition / Alteration - To construct a detached 23' by 23' accessory building at the rear of this existing single detached house site, to provide two parking spaces having vehicle access from the rear 20' lane.

Listed on FolioProjects
2026-11-27
Location
3866 W 35TH AVENUE, Vancouver, BC V6N 2N9
Application number
BP-2025-00892
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2023-2025 · Last checked 2026-11-27T04:35:23.29786+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-27 04:44:05.025703+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · BP-2025-00892

Enquiry Centre - Addition / Alteration - To construct a detached 23' by 23' accessory building at the rear of this existing single detached house site, to provide two parking spaces having vehicle access from the rear 20' lane. Letters of Assurance: Schedule B Structural: Adam Samuel Densmore P.Eng (778-791-7456) Notes: - This permit is for alterations as shown in plans only. Any unauthorized work on this site, existing or otherwise, is neither recognized nor approved and may be subject to enforcement action. - Contractor and Owner are responsible for protecting street trees and private trees that are protected under The Protection of Trees Bylaw (if there are any) in proximity to any work per City of Vancouver Protection of Trees Bylaw and tree protection standards; all landscaping / street trees impacted by construction work to be made good (equal or better). - No tree removals (private trees that are protected under the Protection of Trees Bylaw) are approved with this permit. - Any necessary pruning of trees to be done by an ISA certified arborist, if required with this permit. - No heavy machinery or storage of materials or equipment permitted under the canopy dripline or within Critical Root Zone, whichever greater, of existing trees (street trees or private trees that are protected under The Protection of Trees Bylaw). - No construction allowed within the Critical Root Zone of existing trees (street trees or private trees that are protected under The Protection of Trees Bylaw). OK for SIPS per W. Wong February 25, 2025

Application address
3866 W 35TH AVENUE, Vancouver, BC V6N 2N9
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 85000.00

Type of work: Addition / Alteration

Permit category: Renovation - Residential - Lower Complexity

Property use: Dwelling Uses

Specific use: Single Detached House

Area: Dunbar-Southlands

Permit issued: 2025-06-17

Permit number created: 2025-02-25

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.