Building permit — New Building · BP-2019-04961
Certified Professional Program - New Building - To construct a new 5 storey industrial (Group F-2) high-rise building consisting of: Level 1- car - wash facility Level 2 to Level 5 - self storage. The building is designed to operate as a single tenant space. This BP application has been reviewed under VBBL 2014. 15-Feb-2022 - Revision# 3 - issued. - To change the use of partial ceilings/ decks in the self storage units at Levels 2 to 5, and to install sky lockers ( 4'-0" high and 5 '-0" deep) accessible by rolling ladders operated by storage personnel only. Note: Two means of egress from the newly created floor areas at levels 2 to 5 have not been provided, nor the width of the access aisles have been changed, therefore the City agreed to permit installation of the sky-lockers under the following conditions: The entire aisle will be closed on both ends for the duration of the loading/ un-loading process of sky lockers by storage personnel only. Operational Letter of Commitment by the Owner on file. - Increased # of lockers from 800 to 1350. - Removal of most of the PV panels. Change in the Energy compliance path from ZEB to Carbon neutral. For full description of all changes refer to Architectural, Mechanical, Electrical Modification memos provided by the respective RPR. 30-Aug-2022 -Revision #4 Change of CP Effective Aug. 26, 2022 Edward Chow, P. Eng., CP will be the Certified Professional of Record and code consultant for this project. Letter by the outgoing CP of Record, Gerard Sass, P. Eng., CP on file.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.