Project · Public

Building permit — Addition / Alteration — 3583 KINGSWAY, Vancouver, BC V5R 5L9

0 visitors / 30 days

Source: Vancouver — Issued permits — 2020-2022

Field Review - Addition / Alteration - Interior alterations to move 2 bicycle spaces from bike storage room on level 1 to the P2 level and build new 2 piece wheel ramp accessible washroom for service use only in the bike storage room on…

Listed on FolioProjects
2026-11-28
Location
3583 KINGSWAY, Vancouver, BC V5R 5L9
Application number
BP-2021-01439
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2020-2022 · Last checked 2026-11-28T22:10:23.523456+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-28 22:22:16.865305+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · BP-2021-01439

Field Review - Addition / Alteration - Interior alterations to move 2 bicycle spaces from bike storage room on level 1 to the P2 level and build new 2 piece wheel ramp accessible washroom for service use only in the bike storage room on level 1 in this existing 8 storey mixed use building on this site. Scope of work includes: alterations to remove and relocate 2 bike racks to the P2 level; install new washroom - walls and door with automatic opener, wheel ramp, plumbing, HVAC fan and heater, electrical, lighting and finishes. Revision #1 issued June 11, 2021 (R. Foster) to remove "accessible washroom" from the scope of work includes information. OK for Field Review per S. Yu April 12, 2021 Notes: ~ Energy Upgrade: E2 - Lighting - Upgrade to Local Control (per 9.4.1.1.(a) of ASHRAE 90.1-2016) ~ Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. ~ Schedule A and Schedule B Architectural submitted by Paul Goodwin, Architect, AIBC of GBL Architects Inc., Tel: 604-736-1156.

Application address
3583 KINGSWAY, Vancouver, BC V5R 5L9
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 10000.00

Type of work: Addition / Alteration

Permit category: Renovation - Commercial/ Mixed Use - Lower Complexity

Property use: Dwelling Uses; Retail Uses

Specific use: Multiple Dwelling; Not Applicable

Area: Renfrew-Collingwood

Permit issued: 2021-05-21

Permit number created: 2021-04-12

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.