High Density Housing / Commercial - Addition / Alteration - NOTE: This is a NFPA 13R application.

Listed on FolioProjects
2026-11-28
Location
3509 TRIUMPH STREET, Vancouver, BC V5K 1V2
Application number
BP-2019-02648
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2020-2022 · Last checked 2026-11-28T21:40:26.026525+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-28 22:14:16.554952+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · BP-2019-02648

High Density Housing / Commercial - Addition / Alteration - NOTE: This is a NFPA 13R application. Building #1, NFPA 13D (2014 Permit) To retain and convert a two-storey with basement, character one-family dwelling to a Two-Family Multiple Conversion Dwelling (and to construct a new detached two-storey, One-Family Dwelling infill with 2 car garage, and 1 adjacent surface parking space at the rear of the site - separate permit) Building Review Branch Notes: - Main building project value: $500,000 - Main permit for this lot (infill BP-2019-02649), all time entries, reviews, etc. Building Permit for DP-2018-00769 - West side of main building is less than 1 m away from property line. Any new construction has to be non-combustible. Roof overhang will be cut back to provide minimum 0.45 m distance from property line. - All faces of infill to be 1 hour fire-rated. Roof overhang projecting within 1.2 m form property line to be non-combustible. - All new windows, doors, and skylights shall conform to AAMA/WDMA/CSA101/I.S.2/A440, NAFS. * Reviewed under VBBL 2014 and during 2020 pandemic crisis Revision 1 - Basement: HRV unit relocate to basement (Both Units) Add AC unit: Ext units located at _______, Int. unit located at basement crawl space Washroom configuration modified adaptable washroom (Both Units) East Elevation windows size change ( 1 in South unit, 1 in North unit) -First Floor: 3 piece bathroom removed and replace with 2 piece bathroom (Both Units) Bathroom and kitchen location changed (Both units) North Elevation window size change (2 in north unit) -Second Floor: South unit washroom remove and add closet North unit washroom and closet configuration modified and relocated. North unit window size change (2 in north units)

Application address
3509 TRIUMPH STREET, Vancouver, BC V5K 1V2
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 705000.00

Type of work: Addition / Alteration

Property use: Dwelling Uses

Specific use: Multiple Conversion Dwelling

Area: Hastings-Sunrise

Permit issued: 2021-07-19

Permit number created: 2019-06-13

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.