Building permit — New Building · BP-2019-01108
Certified Professional Program - New Building - This is permit has been issued for site work, below grade facilities and four levels common underground parking for the proposed development To construct a residential development consisting of three buildings: Building 1 - 23 storey tower with 6 level podium -258 units Building 2 - 2 storey -7 townhouse units Building 3 - 2 storey -3 townhouse units all over four levels of underground parking accessible from Oolichan Way. Note: Total number of market dwelling units is 268. Note: Permanent dewatering is provided by secant pile walls installed along entire perimeter of this site. On the south -west side secant pile wall is shared by both properties 8690 Jack Uppal St. (related to BP-2018-04844) and 3430 E Kent Ave South. 10-Jan-2020 - Stage 1 (to place the secant piles) issued. 09-Apr-2020 - Stage 2 (excavation and shoring) issued. 03-Sep-2020 - Stage 3 (full construction) issued - COVID19. 11-Jun-2020 - Revision#1 - COVID19. Changes to secant pile design . Effective May 8, 2020 M. Janes, P. Eng. assumed responsibilities for Sch B -Geotechnical - items 7.1 to 7.4. 27-Oct -2020 -Revision#2 Revised drawings from the incoming geotechnical engineer (temporary) prepared by Isherwood for Excavation and Shoring only. 7-Jan- 2022 - Revision#3 Changes to L22 and L23 to provide internal stair access to new private roof decks for Suites 2201 and 2203 as approved under DPMA - DP-2021-00518. A/M/E Revision Summary Letters and DP Compliance Letter on file. 10-Nov-2023 - Revision#4 To Add an Energy Transfer Station including Heat Exchanger, distribution - piping between ETS and the district energy service distribution, control valves, instrumentation and metering. 6-Sep-2023 - Revision#5 Changes to BP A/M/E/CC drawings following changes approved under a DPMA. Refer to Memos with changes by RPR of A/M/E/CC disciplines.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.