Building permit — Addition / Alteration · BP-2022-04387
Field Review - Addition / Alteration - #401 Interior alterations to install a show suite in the existing office for the full floor tenant at unit #401 in the commercial building on this site. Tenant: Alabaster Homes OK for field review per D.Langevin Sept 12, 2022 OK for BP per S Dugaro Sept 13, 2022 Energy Upgrade: E2 - Lighting - Upgrade to Incorporate Automatic Full Off (Per 9.4.1.1.(H) of Ashrae 90.1-2016) Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.