Project · Public

Building permit — Addition / Alteration — 3361 CAMBIE STREET, Vancouver, BC

0 visitors / 30 days

Source: Vancouver — Issued permits — 2020-2022

Field Review - Addition / Alteration - Interior alterations to provide tenant improvements to a new retail limited food tenant in this unit 3361 Cambie Street in this existing commercial building on this site.

Listed on FolioProjects
2026-11-28
Location
3361 CAMBIE STREET, Vancouver, BC
Application number
BP-2021-04907
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2020-2022 · Last checked 2026-11-28T22:30:21.198244+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-28 22:42:26.405189+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · BP-2021-04907

Field Review - Addition / Alteration - Interior alterations to provide tenant improvements to a new retail limited food tenant in this unit 3361 Cambie Street in this existing commercial building on this site. Note: D to E Small suite. existing 2x GWB. Some areas to add GWB. Egress 15 meters. 2 exits required. OK for field review as per Jamie Zhang, Sep.20/21 B Architectural on file. Note: 1. Class 5 Cooking Operations (No Hood): 2. Cooking procedures producing significant grease laden vapours, or significant heat or steam are not permitted 3. Where complaints are received by the Health Department such as mold from too much moisture, over-heating in the work environment, objectionable odors, or build up of grease or smoke residue, the owner or manager is responsible to make the required corrections, such as a menu change or applying for a building permit to comply with the appropriate Class of Cooking Operation. Note: 1. Storefront glazing is to remain clear and unobstructed. No translucent or opaque film, artwork, shelving, display case, curtains or similar elements are to be installed on or directly outside or inside of the approved glazing. Separate permit is required for all signage. 2. Sprinkler building - Building inspector to determine on site if a separate sprinkler permit is required. No SP req'd per DBI. Energy Upgrade to E2 Note: Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.

Application address
3361 CAMBIE STREET, Vancouver, BC
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 50000.00

Type of work: Addition / Alteration

Permit category: Renovation - Commercial/ Mixed Use - Lower Complexity

Property use: Retail Uses

Specific use: Retail Store

Area: South Cambie

Permit issued: 2021-12-08

Permit number created: 2021-09-20

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.