Project · Public

Building permit — Addition / Alteration — 3350 MONMOUTH AVENUE, Vancouver, BC V5R 5R6

Source: Vancouver — Issued permits — 2023-2025

Enquiry Centre - Addition / Alteration - CF-2021-011943 - Exterior and interior alterations to convert the crawl space into habitable space (approx.

Listed on FolioProjects
2026-11-27
Location
3350 MONMOUTH AVENUE, Vancouver, BC V5R 5R6
Application number
DB-2023-02163
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2023-2025 · Last checked 2026-11-27T05:00:23.609005+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-27 05:27:40.045544+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · DB-2023-02163

Enquiry Centre - Addition / Alteration - CF-2021-011943 - Exterior and interior alterations to convert the crawl space into habitable space (approx. 238.29 sf)and change the use from Single Detached House to Single Detached House with a Secondary Suite on this site. Exterior renovations are limited to remove unauthorized deck cover on rear deck on the main & upper floors. Scope of work: - To remove unauthorized deck covers on the rear deck on the main floor and upper floor. - Proposed two bedrooms, one window on N EL, and closet on the bsmt level. Ok for SIPs as per J. Zhang Schedule B Structural - Makhan S Dhillon, P. Eng - 604-537-6271, [email protected] REUP submitted as per Satvir Gill, 604-259-8060, [email protected] #1-3350 Monmouth Av - Principal Dwelling #2-3350 Monmouth Av - Secondary Suite Note: - No strata-titling will be permitted. - An annual Vancouver Business License must be obtained prior to the rental of this approved one-family dwelling and/or secondary suite on this site. - Install interconnected, hardwired, 120 volt smoke alarms with battery back-up and silencing feature, in each sleeping unit and within 5m outside each sleeping areas on each storey as per Building Bylaw 9.10.19.3 - Install Carbon Monoxide Alarm as per Building By-Law 9.32.4.2 - Upgrade work under Part 11 (based on value of work – energuide related Part 11.2.1.4.) - Ceiling height to be a min. 6ft 6" over 80% of the suite area and all exit routes - Dedicated 3'-0" wide firefighting access path with overhead clearance of 2m to be maintained at all times - All unsafe guards and handrails to be upgraded to the satisfaction of the Chief Building Official.

Application address
3350 MONMOUTH AVENUE, Vancouver, BC V5R 5R6
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 52500.00

Type of work: Addition / Alteration

Permit category: Renovation - Residential - Lower Complexity

Property use: Dwelling Uses

Specific use: Single Detached House w/Sec Suite

Area: Renfrew-Collingwood

Permit issued: 2024-01-16

Permit number created: 2023-06-19

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.