Project · Public

Building permit — Addition / Alteration — 333 SEYMOUR STREET, Vancouver, BC V6B 5A6

0 visitors / 30 days

Source: Vancouver — Issued permits — 2020-2022

Certified Professional Program - Addition / Alteration - Major vertical addition.

Listed on FolioProjects
2026-11-28
Location
333 SEYMOUR STREET, Vancouver, BC V6B 5A6
Application number
BP-2019-01995
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2020-2022 · Last checked 2026-11-28T21:40:22.504678+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-28 23:44:12.231189+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · BP-2019-01995

Certified Professional Program - Addition / Alteration - Major vertical addition. Interior and exterior alterations and to provide additional floor area on the ground through third floor levels to this existing 19-storey highrise office building. - Level 1: increased floor area - Level 2: increased floor area (gym) - Level 3: increased floor area; change of occupancy (amenity space to office) all over 4 levels of existing underground parking accessed from West Cordova Street. The existing parking is connected to the underground parking at 601 West Hasting St. at Level P1. Access to to the 601 West Hastings parkade will be via 333 Seymour parking entrance. Refer to AL-2019-00071 and BP-2018-04746 for more details. Scope of work includes upgrade of the entire building over 5-year period (average 3 floors per year) in accordance with requirements of Part 11 of the VBBL 2014: - E5 - Lighting system to be upgraded to 9.4 of ASHRAE 90.1-2010 - N4 - Non- structural safety - A4 - Accessibility - deferred to Stage 3 Upgrades to meet requirements of F4 and S4 are covered under this permit. See Code Report by LMDG and report by RJC. 12-Nov-2019 - Stage 1 (structural, rough-in mechanical/plumbing and electrical only) issued. 24-July-2020 - Stage 2 (full construction except accessibility upgrade( A4) - ADO at Washrooms within the entire building). 12-Feb-2021 - Stage 3 ( A4 upgrading deferred to future tenant improvements as accepted by the CBO. Refer to LMDG Code Report Revised Dec. 15, 2020). Revision#1 - 17-July-2020 tn As of 01-May-2020 Mr. Jim Huffman, Architect AIBC assumed responsibilities as the Coordinating Registered Professional and Architect of Record. Revision#2 - 27-May-2021 tn As of 12-Mar-2021 Mr. Roger Dupuis, P. Eng. assumed responsibilities as the Registered Professional Of Record for Electrical discipline for the 333 Seymour St. project.

Application address
333 SEYMOUR STREET, Vancouver, BC V6B 5A6
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 8469295.00

Type of work: Addition / Alteration

Property use: Cultural/Recreational Uses; Office Uses; Parking Uses; Retail Uses

Specific use: Fitness Centre; General Office; Not Applicable; Parking Garage

Area: Downtown

Permit issued: 2021-02-12

Permit number created: 2019-05-08

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.