Building permit — Addition / Alteration · BP-2021-04096
Field Review - Addition / Alteration - #304 - 3rd floor Interior alterations to the kitchen and bathroom in this dwelling unit on the 3rd floor (#304) in this existing multiple dwelling building. REVISION #1: to add to scope of work to renovate the existing bathroom adjacent to the kitchen. Oct. 3, 2022 mlh NOTE: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. Building Sprinklered - Building inspector to determine on site if a separate sprinkler permit is required. E2 Upgrade - Install timer (up to 60 minutes) for washroom fan. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.