Building permit — New Building · BP-2022-02885
High Density Housing / Commercial - New Building - To construct a One-Family Dwelling - Part 3 Residential Building with an attached garage, having vehicular access from W. 55th Avenue; and To construct a farm stable building and a detached accessory building for storage of farm equipment. Rev#1 - C. Fong - March 16, 2023. - Change of the Structural Engineer of Record from P. Eng. Florencio Bautista to P. Eng. Dan Wicke, P. Eng. effective February 1, 2023. Building Review Branch Notes: 1. Sch. A, D, Arch. B, Struct. B, Geo. B, Mech. & Plmb. B are submitted. 2. Separate permit is required for the outdoor swimming pool. 3. Compliance with VBBL 2019 amendment effective January 1, 2022. 4. Entire residential building is to be sprinklered to NFPA 13D, and the farm stable building and equipment shed are sprinklered to NFPA 13 requirements. 5. All new windows, doors, and skylights shall conform to AAMA/WDMA/CSA101/I.S.2/A440, NAFS. Rev#2 - P Volpi (Jan. 4, 2024) (Note: Revision #2 reviewed and approved to VBBL #12511 (2019)) (see revision description on approved plans) Revision #3 (P Volpi, Jan 28/25) 1. Add a compost & manure shed, goat shed, chicken coop, infill wall in lieu of of door in riders' lounge, interior wall in riders' lounge, & a dog house. 2. Increase paddock & remove manure enclosure. 3. Change window to door for farm shed's main entry, wood storage to to recycling closet with by-pass door (farm shed), and driveway gate dimensions and shift to be on property line. Revision #4: (P Volpi, Sept. 11/25): 1. Relocate BC Hydro transformer to avoid crossing ditch; 2. Remove trees 855 & 921 as needed to accommodate transformer
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.