Building permit — Addition / Alteration · BP-2021-06195
Field Review - Addition / Alteration - Interior alterations to install new electrical equipment in an existing storage room on the mezzanine of this existing retail Municipally Designated Heritage B building, for the BC Hydro "H" frame elimination project Revison#1 Change the location of the proposed new electrical equipment from mezzanine to 3rd floor. Construct a new electrical room on 3rd floor of this existing retail Municipally Designated Heritage B building, for the BC Hydro "H" frame elimination project. Energy Upgrade exempted: H-Frame Removal Project OK for Field Review per K Vogt November 25, 2021 Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. No Sprinkler permit required, as determined by the District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.