Building permit — Addition / Alteration · BP-2021-04680
Field Review - Addition / Alteration - #201 - 2nd floor (full floor tenant) Interior alterations to provide improvements for this existing full floor general office tenant on the 2nd floor (#201) in this existing commercial building on this site. Scope of work: remove/construct partition walls, doors, millwork, finishes, reconfiguration of HVAC, new lighting, electrical, plumbing, mechanical and sprinkler work. TENANT: Bell Canada Letters of Assurance submitted by: Schedule A and Architectural Schedule B, Arnold Chan, Architect, ph: 604-428-3111 Mechanical and Plumbing Schedule B, Recep Ahmet Ozata, P.Eng., ph: 604-684-5995 Electrical Schedule B, Mr. Bo Wang, P.Eng., ph: 604-562-6696 OK for Field Review as per R. Astorino - September 1, 2021 Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. E2 - HVAC - Clean and Balance all Air Systems (per 6.7.2.3.2 of ASHRAE 90.1-2016) Note: Energy checklist is currently no longer required with your building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.