Building permit — Addition / Alteration · DB-2023-01761
Field Review - Addition / Alteration - Exterior and interior alterations to provide improvements and change the use to a Single Detached House with Secondary Suite building on the site. Add washer /dryer on main floor Add ensuite bathroom to main floor master bedroom Scope of work: new doors and walls, electrical, and plumbing. Headroom: May be reduced to 1950 mm over 80% of the suite area and all egress routes. The minimum clear height under the remaining suite floor area shall be not less than 1 850 mm, except public corridors and exits which shall be not less than 2 000 mm ---- Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.