Building permit — Addition / Alteration — 2941 E 5TH AVENUE, Vancouver, BC V5M 1N6

0 visitors / 30 days

Source: Vancouver — Issued permits — 2020-2022

Field Review - Addition / Alteration - Interior alterations and change of use of this existing one-family dwelling to a one-family dwelling with secondary suite.

Listed on FolioProjects
2026-11-28
Location
2941 E 5TH AVENUE, Vancouver, BC V5M 1N6
Application number
DB-2020-00112
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2020-2022 · Last checked 2026-11-28T23:00:13.952532+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-28 23:37:34.8419+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · DB-2020-00112

Field Review - Addition / Alteration - Interior alterations and change of use of this existing one-family dwelling to a one-family dwelling with secondary suite. Scope of work includes validate existing West side firefighter access path to laneway house and re-route for compliance with required firefighter travel distance from curb as per drawings. Building 1 #1 - 2941 E 5th Av - One Family Dwelling (1st and 2nd storey) #2 - 2941 E 5th Av - Secondary Suite (basement) Building 2 #3 - 2941 E 5th Av - Laneway House Address assigned per approved plans. Fire and Emergency street access (walkway) to the laneway house and secondary suite is from the west side. Street access must be provided and maintained at all times. The building addresses are to be posted and to be visible from the street in accordance with the Building By-law. Note: - No strata-titling will be permitted. - This is a two-storey building pursuant to the Zoning and Development By-law. - An annual Vancouver Business License must be obtained prior to the rental of this approved one-family dwelling and/or secondary suite on this site. - Provide minimum headroom of 6’-6” over 80% of the suite area and all exit routes. - Smoke alarms to be installed in compliance with Subsection 9.10.19., Division B of the Vancouver Building By-law (2019) - Carbon monoxide alarms shall be installed in conformance to Subsections 6.2.4. and 9.32.4., Division B of the Vancouver Building By-law - Energy efficiency upgrade to be in conformance with Table 11.2.1.4. of the Vancouver Building By-law OK for Field Review per L.Telefson Jan.10, 2020

Application address
2941 E 5TH AVENUE, Vancouver, BC V5M 1N6
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 5000.00

Type of work: Addition / Alteration

Permit category: Renovation - Residential - Lower Complexity

Property use: Dwelling Uses

Specific use: Single Detached House w/Sec Suite

Area: Hastings-Sunrise

Permit issued: 2020-03-02

Permit number created: 2020-01-10

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.