Project · Public

Building permit — New Building — 2920 EUCLID AVENUE, Vancouver, BC

Source: Vancouver — Issued permits — 2023-2025

Low Density Housing - New Building - To construct a 2-storey duplex with 2 secondary suites located in basement and a detached accessory building (garage) at the rear providing 1 parking space and a surface parking, having vehicular…

Listed on FolioProjects
2026-11-27
Location
2920 EUCLID AVENUE, Vancouver, BC
Application number
DB-2022-03668
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2023-2025 · Last checked 2026-11-27T04:50:42.520399+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-27 05:27:28.258174+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — New Building · DB-2022-03668

Low Density Housing - New Building - To construct a 2-storey duplex with 2 secondary suites located in basement and a detached accessory building (garage) at the rear providing 1 parking space and a surface parking, having vehicular access from the lane. Note: This is a 2 storey building pursuant to the Zoning and Development By-Law ******THIS PERMIT HAS BEEN ISSUED UNDER THE REQUIREMENTS OF VBBL 2019****** This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022. The entire building to be sprinklered to 2x NFPA 13D. As shown by an asterisk (*) on the building permit floor plans and/or elevations, exit protection is required to be provided in accordance with Articles 9.9.4.4., 9.9.4.6., and/or 9.37.2.8. of the 2019 VBBL. NOTE: To achieve the required FSR a floor space exclusion of 2% has been applied to this application as per section 10.15.1 of the district schedule, to accommodate improved building performance. 1. Covenant registered under CB695250-CB695251 2. No strata titling permitted for secondary suites 3. External mechanical unit located in rear yard 4. Schedule B Alan Prahalad P.Eng (604-831-1431) Structural and Geotechnical 5. Rev #2 AMPCO Electric LTD. All rooms adjacent to West exposing building face shall be sprinklered. "Combustible projections or roof soffits on an exposing building face shall not project to less than .45m from the property line and shall be in compliance with VBBL 2019 9.10.15.5.(9)" Assigned Addressing: EAST UNIT #1-2920 Euclid Av - Principal Dwelling (1st-2nd floor) #2-2920 Euclid Av - Secondary Suite (basement) WEST UNIT #1-4808 Earles St - Principal Dwelling (1st-2nd floor) #2-4808 Earles St - Secondary Suite (basement)

Application address
2920 EUCLID AVENUE, Vancouver, BC
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 724000.00

Type of work: New Building

Permit category: New Build - Low Density Housing

Property use: Dwelling Uses

Specific use: Duplex w/Secondary Suite; Secondary Suite

Area: Renfrew-Collingwood

Permit issued: 2023-05-15

Permit number created: 2022-07-20

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.