Building permit — New Building · DB-2022-05464
Low Density Housing - New Building - To construct a 2 storey one-family dwelling ($4,887,000.00) with an attached garage providing 3 parking spaces, having vehicular access from Point Grey Road. Revision#1 [HCA permit extended]: All work to conform to HCA Inspection Permit 2023-0400 and HCA Alteration Permit 2023-0401 issued by the Archaeology Branch of BC; Musqueam Heritage Investigation permit MIB-2023-200-AIA; Squamish Nation Archaeology permit SNAIP 23-0220; and Tsleil-Waututh Nation Cultural Heritage Investigation permit TWN-23170-23181. Revision#1: Appeal No. Z36260 heard by the Board of Variance on March 3, 2026 and the design-changes for development beyond the existing established ‘building line’ was APPROVED, thereby granting a relaxation of the Zoning & Development By-law and permission to ‘amend’ the development proposal with design-changes and including the depth of the approved swimming pool from 4.0 feet to ‘4.50 feet’ (in depth) with minor design-changes as specified in the Architect’s letter. Appeal No. Z36140 heard by the Board of Variance on May 21, 2024 and was ALLOWED, thereby granting relaxation of the Zoning & Development By-law and permission to add new development on the North portion of this existing site. Note: This is a 2 storey building pursuant to the Zoning and Development By-Law 1- Electric Geothermal Heat Pump unit proposed 2- Schedule D: F. Russell Hollingsworth (604-925-9095) 3- Schedule B: F. Russell Hollingsworth (604-925-9095) Architectural 4- Schedule B: Patrick Elischer P.Eng (604-738-0048) Structural 5- Schedule B: Matt Kokan p Eng (604-439-0922)Geotechnical 6- HPO: Residential Builder – Keystone Project Ltd License#22076 7- Entire Building to have NFPA 13-D ****ALL PROJECT COORDINATOR NOTES HAS BEEN ACCEPTED BY THE APPLICANT**** **This permit is issued under the VBBL 2019, with updated energy requirements as per bylaw # 12997 effective Jan 01, 2022.***
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.