Building permit — Addition / Alteration · BP-2022-01966
Field Review - Addition / Alteration - Voluntary upgrade to introduce fire suppression and to improve cooling to main structure on the property (Main Hall). All structures on the property (Main Hall, Gymnasium and Office Structures) are to replace existing electrical light fixtures with new energy compliant models. (*see Revision #1) Scope of work: addition of sprinkler systems to the 3 structures on site (Main Hall, Gymnasium and Office Structures), add split air units to Main Hall and Offices and replacement of existing electrical receptacles and lighting fixtures. Nov. 10, 2022 mlh REVISION #1: remove proposed work relating to HVAC units to the Office area, remove proposed storage room at basement level and remove proposed sprinkler addition work to the Gymnasium and Office area (see SP-2022-02412 - Fire Suppression System). Also original project description revised to reflect true scope of work. Roof top condenser unit OK per POD, Medhi; Nov 3, 2022 Letters of Assurance submitted by: Schedule A and Architectural Schedule B, Patrick Yue, Architect ph: 778-688-7317 Mechanical and Plumbing Schedule B, P.Eng., ph: 604-684-5995 Electrical Schedule B, Patrick Krzesinski, P.Eng., ph: 604-986-4128 OK for Field Review per N. Jalakalami, Apr. 12, 2022 E2 Upgrade - Lighting Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.