Building permit — Addition / Alteration · DB-2020-00883
Field Review - Addition / Alteration - Interior alterations and a change of use from Printing or Publishing to provide tenant fitout for a new Machinery or Equipment Manufacturing use, which also includes exterior alterations to provide new larger windows at the south and west elevations, and to provide replacement overhead door and man door at the east elevation of this existing one storey industrial building. Scope of work includes installing partition walls and to construct two new bathrooms (one accessible). REVISION #1: Interior layout changes, new Structural Drawings and new Schedule A (submitted by Susan Scott, Architect, ph; 604-788-7990) and new Structural Schedule B (submitted by Dan Wicke, P.Eng., Struct.Eng., P.E., S.E., ph: 604-484-2859). Increase in project value from $300,000 to $303,000. Dec. 14, 2020 mlh Tenant: Kamengo Technology Inc. OK for exterior alterations to provide new windows and replacement overhead door and man door as per planner Benjamin Dufix, March 5, 2020. OK for field review as per Ian Mackie, March 5, 2020. This building is not sprinklered. Architectural Schedule B and Schedule D submitted by Susan Scott - 604.788.7990 Energy Upgrade Selected: E2 - BEnv - Reduce air leekage of all Loading Dock Doors per 5.4.3.3 of ASHRAE 90.1-2016
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.