Building permit — Addition / Alteration · BP-2022-04221
Field Review - Addition / Alteration - 2nd Floor Interior alterations to renovate the two (2) existing Radiation Therapy Planning vaults on the second level to accommodate new medical equipment (2 CT scanners) at this existing Cancer Clinic Annex. Scope of Work: Demolish/replace existing wall, door, frame and ceiling. Remove flooring, millwork, electrical, plumbing and sprinkler work to suit. Letters of Assurance submitted: Schedule A and Architectural Schedule B by David Kury, Architect, AIBC, 604.417.1211 Electrical Schedule B by Raj Atwal, P.Eng. Ph#604-561-3234 Plumbing/Mechanical Schedule B by Stuart Adamson, P.Eng., 604.345.1523 OK For Field Review by Marisa Le - Sept 16/22 Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. OK For Field Review per Marissa Le - Sept 16/22 E2 - Lighting - Upgrade to Bilevel Lighting Control (per 9.4.1.1.(d) of ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.