Building permit — Addition / Alteration — 2638 W 15TH AVENUE, Vancouver, BC V6K 2Z5

0 visitors / 30 days

Source: Vancouver — Issued permits — 2020-2022

Field Review - Addition / Alteration - Related to CF-2020-003204 To change the use of this existing two-storey with basement, one-family dwelling to a one-family dwelling with a secondary suite with 1 off-street parking spaces provided in…

Listed on FolioProjects
2026-11-28
Location
2638 W 15TH AVENUE, Vancouver, BC V6K 2Z5
Application number
DB-2020-02861
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2020-2022 · Last checked 2026-11-28T23:05:25.110926+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-28 23:37:38.571801+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · DB-2020-02861

Field Review - Addition / Alteration - Related to CF-2020-003204 To change the use of this existing two-storey with basement, one-family dwelling to a one-family dwelling with a secondary suite with 1 off-street parking spaces provided in the rear (in association with the LWH permit DB-2020-02511), having vehicular access off the South lane. **Note: DBI will need to confirm minimum 6'-6" ceiling height over 80% of the suite area and all exit routes at all times.** This permit is to validate work without permit. OK for Field Review per S.Yu on Sept 15, 2020 Scope of work includes: upgrading for suite as per IA-2020-00099. Schedule B (Structural) required by District Building Inspector to raise the central beam to fix the required headroom clearance and the ductwork clearance will also have to be fixed. REUP is not required Note: - No strata titling will be permitted. - 1 off-street parking spaces provided in the rear (in association with the LWH permit DB-2020-02511), having vehicular access off the South lane. - an annual Vancouver business license must be obtained prior to rental of either the principal dwelling unit or the secondary suite - Dedicated 3'0" wide firefighting access path with overhead clearance of 2 m to be maintained at all times - Smoke alarms to be installed in conformance with Vancouver Building By-law Subsections 3.2.4 and 9.10.19 - CO alarms to be installed in conformance with Vancouver Building By- law Subsections 6.2.4 and 9.32.4

Application address
2638 W 15TH AVENUE, Vancouver, BC V6K 2Z5
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 1000.00

Type of work: Addition / Alteration

Permit category: Renovation - Residential - Lower Complexity

Property use: Dwelling Uses

Specific use: Single Detached House w/Sec Suite

Area: Kitsilano

Permit issued: 2020-12-07

Permit number created: 2020-09-15

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.