Building permit — Addition / Alteration · BP-2022-01814
Field Review - Addition / Alteration - Interior alterations and change of use from Artist studio class A (F2) to Production studio (F2) in this existing Municipally Designated Heritage C commercial building on this site. Scope of work includes constructing interior partition walls to create two rooms, installing a raised floor, validating the washrooms and kitchenette, constructing an interior ramp and changing the lighting throughout. Ok for field review as per Kirat Kang - April 6, 2022 Notes: - Energy Upgrade: E2 - Lighting - Upgrade to incorporate scheduled shutoff (per 9.4.1.1.(i) of ASHRAE 90.1-2016) - This building is sprinklered. DBI to determine on site if a separate sprinkler permit is required. - Storefront glazing is to remain clear and unobstructed. No translucent or opaque film, artwork, shelving, display case, curtains or similar elements are to be installed on or directly outside or inside of the approved glazing. Separate permit is required for all signage Energy checklist is currently no longer required with your Building Permit application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.