Building permit — Demolition / Deconstruction · BP-2018-06532
Enquiry Centre - Demolition / Deconstruction - To demolish the existing 2 storey commercial building on this site. Note: "Notice of Demolition must be provided to District Building Inspector 24 hours in advance of demolition by calling 3-1-1 or 604-873-7000 outside of Vancouver." The deconstruction shall be in accordance with the submitted deconstruction plan and to be confirmed through an acceptable Deconstruction Compliance Report form with copies of recycling and disposal facility receipts. Attach all receipts and submit by email to [email protected]. All deconstruction is to be completed to the satisfaction of the Director of Planning prior to the issuance of the building permit. Landscape Review conditions: 1.14 coordination with the Vancouver Park Board for the safe retention of the street tree noted as a 36 in. dbh, 40 ft. tall Quercus robur as follows; i. Parks will collaborate on the design and all concrete removal and any excavation must be done under arborist supervision. Refer to Engineering Condition 1.21 ii; ii. no re-landscaping in the Critical Root Zones (CRZ) of retained tree; iii. no digging or grade changes within 20 ft. of the outside of the trunk in all directions possible; iv. no heavy equipment to drive over sidewalk in the tree protection zone in all directions; v. zero excavation past the existing foundation; (Note to Applicant: The existing foundation to be peeled back and shotcrete installed up against that exposed area.) vi. Park Board to perform the requested pruning at the applicants cost; (Note to Applicant: Coordination to be arranged with Vancouver Park Board staff Cabot Lyford.)
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.