Building permit — New Building — 2485 LARCH STREET, Vancouver, BC V1V 1V1

0 visitors / 30 days

Source: Vancouver — Issued permits — 2020-2022

Certified Professional Program - New Building - Removal of the existing structures/excavating the site to allow for a 2-level underground parking garage an 4 levels above ground with a mixture of retail and residential uses.

Listed on FolioProjects
2026-11-28
Location
2485 LARCH STREET, Vancouver, BC V1V 1V1
Application number
BP-2018-01574
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2020-2022 · Last checked 2026-11-28T21:40:08.966533+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-28 23:36:13.011627+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — New Building · BP-2018-01574

Certified Professional Program - New Building - Removal of the existing structures/excavating the site to allow for a 2-level underground parking garage an 4 levels above ground with a mixture of retail and residential uses. The structure will be built using a cast-in-place construction method. This is a CP Process Permit and the CP is Jeff Mitchell of GHL Consultants. Stage 1: Excavation & Shoring. Sept. 17, 2018. B. Smith Stage 2: Foundation & structure to ground level, including main floor slab. (Dec. 4/19, B, Smith) Stage 3: Full Construction. May 25, 2020. B. Smith REVISION #1 (Aug. 24, 2020. B. Smith): Effective Jun 4, 2020, Sophie Mercier (P. Eng.) withdrew as BEP on this permit. The role of BEP has been taken on by Derek Budde, P. Eng. , effective June 3, 2020, and Mr. Budde has provided a Schedule D-1 for his assumption of duties. A new Project Directory has been submitted for this and also to refer to Dan Wong, P. Eng. as the Fire Suppression Engineer (Ron Pavey, P. Eng., had been incorrectly listed as the Fire Suppression Engineer originally). Revision #2 (June 16/21. B. Smith): As per DPMA DP-2020-00893 ... Add electrical room at North end of P1storage garage. Add communication room in P1 storage garage north of Exit Stair #2. Add mechanical room at P1 storage garage Southeast corner. Add 2 bike storage rooms and I garbage/recycling room at P1 storage garage. Combine ground floor dwelling units 2481 & 2483. Revise layouts of dwelling units 405 & 406. Delete dwelling unit 407. REVISION #3 (Aug. 27/21. B. Smith): Effective June 18, 2021 the BEP of record (Derek Budde, P. Eng.) terminated hs involvement. The new BEP effective June 18, 2021 will now be Carolina Maloney, P. Eng. (Morrison Hershfield Ltd.). Letters regarding this change have been received as has a Schedule D-1 from Carolina Maloney, P. Eng.

Application address
2485 LARCH STREET, Vancouver, BC V1V 1V1
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 15283000.00

Type of work: New Building

Property use: Dwelling Uses

Specific use: Multiple Dwelling

Area: Kitsilano

Permit issued: 2020-05-25

Permit number created: 2018-03-22

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.