Building permit — Addition / Alteration · DB-2020-02717
High Density Housing / Commercial - Addition / Alteration - Interior/exterior alteration and change of use from Single Family Dwelling with Secondary Suite (Group C) to Community Care Facility – Class A (Classified as Group C as per 3.1.2.5) Scope of work includes: - Remove upper floor kitchen, replace with bar, interior layout change for bathrooms. - Sprinkler the entire house to NFPA 13D. - Install Fire Alarm system, manual pull station is not required as per 11.4.2.2 if fire alarm and sprinkler water flow alarm are designed as per 3.2.4.7. - Addition of lift in garage, up to deck on second floor. Structural schedule B submitted by Zhanchao Zhao, P.Eng, 604-526-1305 - Add smoke alarms, CO detectors, exit signs and emergency lights - Remove awning over deck and secure railings on the deck * All unsafe conditions to be corrected to the satisfaction of the District Building Inspector. Building Review Branch Notes: - As per 11.2.1.4 upgrade required to entire building to design level of F2, S2, N2, A2 - Building is classified as Group C major occupancy as per 3.1.2.5. - Related to IA-2018-01107 - Lift to comply with CAN/CSA-B355 “Lifts for Persons with Physical Disabilities”. * Reviewed as per VBBL 2019 and during 2020 Pandemic Crisis
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.