Building permit — Addition / Alteration · DB-2021-03343
Field Review - Addition / Alteration - Interior alterations to this existing grocery store (2279 to be retained) and expansion into General Office unit (2283) in this existing commercial building on this site. Scope of work: Deconstruct demising wall. Deconstruct interior walls. Relocate walk-in cooler. Interior layout alterations. OK for field review DBI Dan Honan OK for field review POD Hamid Mahpour Letters of assurance submitted by: Emanuele Trinca Colonel, 604-728-7024, Reg. Arch- Schedule A; Architectural Schedule B. Kosta Marcakis, 604-254-0868, P.Eng, Mech. Eng. Structural Schedule B. S.I.Fernandez Alarcon, 604-609-0500, P.Eng, Electrical Schedule B. Ron Braun, 604-609-0500, MSc, P.Eng, Mechanical and Plumbing Schedule B. A Sprinkler permit may be required, as determined by the District Building Inspector. SP Not required as per DBI, Aug 31, 2021. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.