Building permit — Addition / Alteration · BP-2022-03625
Field Review - Addition / Alteration - Interior alterations to provide improvements to the amenity space on the 10th floor of this multiple dwelling building on this site. Scope of work includes the removal of interior walls, new washrooms, new gas fireplace and range, and new lighting throughout. OK for Field Review per W.Wong Notes: - Energy Upgrade: E2 - Lighting - Upgrade to Local Control (per 9.4.1.1.(a) of ASHRAE 90.1-2016). - DBI to determine on site if Schedule B, Structural, is required. - DBI to determine on site if a separate sprinkler permit is required. - Schedule B, Electrical, Steven Nemetz, P.Eng, 604-736-6562. Energy checklist is currently no longer required with your Building Permit application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.