Building permit — Addition / Alteration · BP-2024-00788
Field Review - Addition / Alteration - Interior alterations to change the use from Restaurant Class-1 to Retail Food Store (meat processing/selling store) on the ground floor of this existing commercial building on this site. The scope of work include to remove the existing walk-in coolers. Revision #1 - adding rear common area - adding in walk-in cooler (built-in) New Tenant: Sultan Halal Meat and Grocery OK for field review as per Jamie Z. on Mar. 6th, 2024 Storefront glazing is to remain clear and unobstructed. No translucent or opaque film, artwork, shelving, display case, curtains or similar elements are to be installed on or directly outside or inside of the approved glazing. Separate permit is required for all signage. Shelving units shall not be more than 6'H. A structural engineer is required if the shelving units are more than 6'H. Energy checklist is currently no longer required with your Building Permit application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.