Building permit — Addition / Alteration · BP-2023-01912
Field Review - Addition / Alteration - #2123 Interior alterations to provide tenant improvements on the ground floor for a new Retail tenant at this existing 1-storey building on this site. Scope of work includes: New non-load bearing interior partitions, new millwork and finishes new furniture and fixtures, and upgrades to the existing HVAC system. New tenant: Peak Performance OK for field review as per Wayland W June 5, 2023. Related to: BP-2020-03613 Note: -DBI to determine if structural plan and Schedule B structural is required. -No translucent or opaque film, artwork, posters, shelving, display cases or similar elements are to be installed on or directly outside or inside of the approved glazing frontages and windows. A separate sign permit is required. -Building is sprinklered, a separate sprinkler permit is required for all related work. -Energy checklist is currently no longer required with your Building Permit application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trade’s permits (e.g. electrical and plumbing). Schedule A Peter J. Mallen Architect AIBC (604) 484-8285 Schedule B Plumbing and Mechanical P.Eng Jason Barabonoff 403-561-3234 Schedule B Electrical P.Eng Brian Calverley 403-269-2125 Schedule B Structural-Non-Sales Storage Racks only, Brian D. Hanson, P.Eng. 509-921-7731
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.