Building permit — Addition / Alteration · BP-2020-00963
Field Review - Addition / Alteration - Interior alterations to provide tenant improvements in this existing Public Utility building including new generator and loadbank. Scope of work: Per the 2019 VBBL to remove/construct new partition walls, doors, new roof top units, penetration through all floors for condensation pipes, new shaft walls, replacing existing windows, finishes, ceiling work, new automatic car/pedestrian gate, new generator and loadbank, electrical, mechanical and plumbing work. REVISION #1: interior partitions scope of work reduced, mechanical and electrical scope of work reduced, and select exterior glazing left out of the original scope. Feb 2, 2021 mlh Selected Energy Upgrade: E2 - Lighting - Upgrade to Restricted to Manual ON (per 9.4.1.1.(b) of ASHRAE 90.1-2016) TENANT: BC Tel Letters of Assurance submitted by: Schedule A and Architectural Schedule B, John E. Gustavson, Architect, ph: 604-687-2511 Mechanical Schedule B, Maciej Sobczyk, P.Eng., ph: 604-375-9756 Electrical Schedule B, Andrew Tashiro, P.Eng., ph: 604-685-9381 Structural Schedule B, Nicole Babuik, P.Eng., ph: 604-738-0048 Schedule D, Karen Kga Kwan, P.Eng., ph: 604-738-0048 Geotechnical Schedule B, Paul A. Davies, P.Eng., ph: 604-395-2300 Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. OK for Field Review per W. Wong/J. Steen - March 10, 2020 NOTE: related to DP-2020-00195 Processed Thru FIT
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.