Building permit — Addition / Alteration · DB-2021-05278
Field Review - Addition / Alteration - #3208 Interior and Exterior alterations to improve the dwelling unit on the 32nd floor unit 3208 in the existing multiple dwelling building on this site. work to include: installing AC unit with heat pump on balcony, install new lighting fixtures and updating bathroom fixtures. OK for field review per D.Langevin 10/12/2021 ******notes: ~ Wall penetration details provided for strata by Morrison Hershfield ~ DBI to determine on site if Sprinkler permit required ~ Heat Pump location OK per Karen G. Planning 10/12/2021 ~Energy Upgrade: E2 - Lighting - Install energy efficient lighting fixtures (single occupied space area) Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.