Building permit — Addition / Alteration · DB-2022-02657
Field Review - Addition / Alteration - 1955 W 10th Avenue Interior alterations to reconfigure the Bathroom, and to create a new Bedroom 2, and to provide new lighting, and exterior alterations to install a new heat pump against the existing exterior wall at the upper floor balcony at 1955 W. 10th Avenue at this existing Infill Multiple Dwelling building. Energy Upgrade: E4-Lighting-Upgrade all lighting controls (per 9.4.1.1. of ASHRAE 90.1-2016) Dwg#: 1.2.1 Note: District building inspector to determine if the proposed location of the new heat pump adjacent to the east guardrail and against the existing upper floor balcony exterior wall would be acceptable. Also, if a Schedule B - Architectural and Schedule D would be required as per Andrew Wroblewski, May 19, 2022. Proposed heat pump location adjacent to the east guardrail and against the existing upper floor balcony exterior wall has been accepted by planner Karen Kallweit-Graham, May 19, 2022. OK for Field Review processing as per Howie Chow, May 19, 2022.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.