Building permit — Addition / Alteration · DB-2023-00500
Field Review - Addition / Alteration - Interior alterations to change the use from Single Detached House to Single Detached House with a Secondary Suite on this site. Note:\t\t \tNo strata-titling will be permitted. \tAn annual Vancouver Business License must be obtained prior to the rental of this approved one-family dwelling and/or secondary suite on this site. \tInstall interconnected, hardwired, 120 volt smoke alarms with battery back-up and silencing feature, in each sleeping unit and within 5m outside each sleeping areas on each storey as per Building Bylaw 9.10.19.3 \tInstall Carbon Monoxide Alarm as per Building By-Law 9.32.4.2 \tUpgrade work under Part 11 (based on value of work – energuide related Part 11.2.1.4.) \tCeiling height to be a min. 6ft 6" over 80% of the suite area and all exit routes \tDedicated 3'-0" wide firefighting access path with overhead clearance of 2m to be maintained at all times Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing The scope includes to remove the unauthorized deck cover over the rear deck. SIPs Related to IA-2022-00253
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.