Project · Public

Building permit — New Building — 19 E 5TH AVENUE, Vancouver, BC V5T 1G7

0 visitors / 30 days

Source: Vancouver — Issued permits — 2020-2022

High Density Housing / Commercial - New Building - To construct a new 4 storey building with medium hazard industrial occupancy (F2) at the lowest floor level (Level 1), and, shell office space (D) at levels 2, 3, and 4.

Listed on FolioProjects
2026-11-28
Location
19 E 5TH AVENUE, Vancouver, BC V5T 1G7
Application number
BP-2020-01029
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2020-2022 · Last checked 2026-11-28T21:50:23.589065+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-28 22:44:08.566672+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — New Building · BP-2020-01029

High Density Housing / Commercial - New Building - To construct a new 4 storey building with medium hazard industrial occupancy (F2) at the lowest floor level (Level 1), and, shell office space (D) at levels 2, 3, and 4. Level 1 also includes a mezzanine. The building will be voluntarily constructed to Passive House standards but will not be certified. The 2019 VBBL applies to this application which has been reviewed during the 2020 Covid-19 pandemic. REVISION #1: (Sept. 20/21. B. Smith) Wall mounted TV added near elevator at ground floor corridor (displays building statistics & monitors information re: this CLT building for public education & information / promotion). Minor design changes to wood screen façade attachment at South end of the building (** Must not project beyond property line). On sheets A7.02 & A7.03 three enclosed dropped ceiling areas at Levels 2 and 3 are deleted. On sheet A2.01, A7.01 and A7.02 the elevator closet at the 4th floor no longer opens directly to Stair no. 1, and, there is a new vestibule between the Stair and the elevator closet (door schedule on A0.20 adjusted to include doors D402.1 & D402.2). Section of concrete block wall added at mezzanine & ground floor to separate Stair No. 4 from adjacent floor areas. A2.00 has revised ground floor location of door from corridor into F2 suite via extension of corridor where door from stair No. 1 opens to corridor. A2.00 now has reduced size of mechanical room near ground floor lower landing of Stair No. 4. Minor changes to reflected ceiling plans.

Application address
19 E 5TH AVENUE, Vancouver, BC V5T 1G7
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 2700000.00

Type of work: New Building

Property use: Manufacturing Uses; Office Uses

Specific use: General Office; Not Applicable

Area: Mount Pleasant

Permit issued: 2020-09-21

Permit number created: 2020-03-12

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.