Building permit — Addition / Alteration · DB-2021-04478
Field Review - Addition / Alteration - Exterior alterations to replace the two existing Air Handling Units with new and install condensing units on the roof of this existing Community Center Heritage 'P''A' building. OK for DB per Maxine Schleger & David Cha letters of assurance submitted by: F.M De Alba Santana, 604-684-5995 P.Eng, Schedule A, Meghanical Schedule B. Victor Lu, 604-569-6500 P.Eng, Electrical Schedule B. Skyler Doornberg, 604-738-0048, P.Eng, Architectural Schedule B, Schedule D. Jordan perrwtt, 604-738-0048, P.Eng, Structural Schedule B. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. NOTE: Please inform the applicant that the heritage property has a provincial designation, which means that they would need to apply to the BC Heritage Branch to receive a Heritage Alteration Permit.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.