Building permit — Addition / Alteration · BP-2021-01834
Field Review - Addition / Alteration - 178 E 32nd - ground level Interior alterations to provide improvements for this new office tenant in this existing mixed use building on this site. Scope of work: remove interior partition walls, new finishes, ceiling work, lighting modifications, electrical and sprinkler work. A structural engineer letter will be required for steel stud storage deck and bulkhead construction on site at the framing inspection. TENANT: Zen and the Art of Clean Energy Solutions Inc. OK for field review per R. Astorino, Apr. 26, 2021 Building Sprinklered - Separate sprinkler permit required for proposed sprinkler work. Energy Upgrade: E2 - Lighting - Upgrade to Local Control (per 9.4.1.1 (a) of Ashrae 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.