Building permit — Addition / Alteration · BP-2021-06448
Field Review - Addition / Alteration - #507 - 5th floor Interior alterations only to provide upgrades to the existing kitchen and bathroom in this existing residential dwelling unit on the 5th floor (#507) at this existing multiple dwelling building. Scope of work: fire stopping work, removal of existing wall, installation of new interior partition walls, cabinetry/countertops, millwork, appliances, flooring, bathtub, plumbing and electrical work. Letters of Assurance submitted by: Architectural, Plumbing, Electrical Schedule B - John J. McCuaig, 604-255-0992 The services of a Structural Engineer may be required, based upon site inspection by the District Building Inspector. OK for Field Review per K. Vogt; Dec 6, 2021 Letters of Assurance submitted: Architectural/Plumbing/Electrical Schedule B by John J. McCuaig, P.Eng. ph#604.255.0992. E2-Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. Revision#1 April 11, 2022 Change of Contractor from Capital Contracting Inc to Solid General Contractors Inc.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.