Building permit — Addition / Alteration · BP-2022-03771
Field Review - Addition / Alteration - #210 - 2nd floor (demising into #210 and #202) Interior alterations to demise unit #210 into two units (#210 & #202) and provide improvements to #210 in this existing commercial building on this site. Scope of work: construct a demising wall and remove partition walls in #210 to create open work space. Electrical to suit. TENANT: Aspect Biosystem Architectural Schedule B submitted by Navid Fereidooni, Architect AIBC, ph: 604-866-5555 * District Building Inspector to determine if a Special Sprinkler Permit is required. E2 - HVAC - Clean and Balance all Air Systems (per 6.7.2.3.2 of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant's responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.