Building permit — Addition / Alteration · DB-2024-02488
Field Review - Addition / Alteration - Exterior and interior alterations to provide tenant improvements to this existing Vehicle Dealer in conjunction with Vehicle Repair Shop. Scope of work includes new interior finishes, custom millwork, EV Charging Stations, and replacement of exterior cladding with new color scheme. Exterior work approved by POD Ben This building is sprinklered. Sch A/B Arch - Christopher Bozyk AIBC - 604-251-3440 Sch B Struc - Sal Tabet P.Eng - 604-984-2994 Sch B Elec - Steven Nemetz P.Eng - 604-736-6562 Sch B Mech - Derek Toth P.Eng - 604-591-2766 Energy Checklist is currently no longer required with your Building Permit application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trade permits. (e.g. electrical and plumbing). It is the applicant's responsibility to identify and note all required upgrades on their BP drawings at the BP stage. Heat pumps must be rated no higher than 60 dB(A). It is the responsibility of the owner and the licensed contractor to ensure heat pumps are specified and sited to minimize the sound level transmission along property lines as required by the Noise Control Bylaw #6555. No Translucent or opaque film, artwork, posters, shelving, display cases or similar elements are to be installed on or directly outside or inside of the approved glazing frontages and windows so that the interior of the premises is visible at all times from the sidewalk. Separate Sign permit required for all new signage
Source: Vancouver — Issued permits — 2023-2025. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.