Building permit — Addition / Alteration · BP-2022-02005
Field Review - Addition / Alteration - #1201 - 12th Floor Interior alterations to provide improvement to this existing dwelling unit on the 12th floor (#1201) of this existing multiple-dwelling building on this site. Scope of Work: Construct a partition wall to convert the larger bedroom back to original floor plan, adding a walk-in closet in the primary bedroom, new doors and electrical work. Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. E2 - Lighting - Install energy efficient lighting fixtures (single occupied space area) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.