Building permit — New Building · BP-2020-01998
High Density Housing / Commercial - New Building - Building Permit for DP-2019-00946 (Two-Family Dwelling) To construct a new two-storey multiple delling building (700,000) containing 2 dwelling units at the front of the lot. Lot to be stratified. Schedule B, Chilh-Yuan Shen, P.Eng (604.484.2859) Structural and Schedule B, Ward Phillips, P.Eng (604.716.8881) Geotechnical submitted for this project. *** THIS PERMIT HAS BEEN ISSUED UNDER THE REQUIREMENTS OF VBBL #12511 (2019)*** Building Review Branch Notes: 1. Reviewed during the 2020 pandemic crisis 2. Entire building to be sprinklered to NFPA 13D 3. Building designed to Part 4, Structural 4. See BP-2020-01999 for Building 2 on site (Infill Building) REV #1: MCD 1. Location of electrical meters shown on site plan 2. Location of gas meters shown on site plan 3. Change to mechanical room in crawl space. Wall of mechanical room now goes right across the crawl space instead of being in an enclosed room. In both sides of the duplex 4. Open railing on stairs to second floor changed to half wall instead of open railing in both sides of duplex 5. Replace built in closets on second floor with drywalled closets on both sides of duplex 6. Added detail of overhang cantilevered porch roof to allow for drainage 7. Changed rear exit doors on north elevation to single doors to match floor plans 8. Revised Structural Schedule B submitted to remove sign-off of Geotechnical - permanent.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.