Building permit — Addition / Alteration · BP-2021-03733
Field Review - Addition / Alteration - #303 Interior alterations to provide improvements to dwelling unit #303 on the 3rd floor of this existing multiple dwelling building on this site- remove kitchen dividing walls and install new fixtures, cosmetic upgrades OK for Field Review per W.Wong, July 16, 2021 Letters of assurance - Structural interior wall assessment: David Mark James Budd P.Eng, Cavvy Structural Engineering. Energy requirements: E2 - Retrofit Path: 1 @ L2; L2 - Appliances - Upgrade to an Energuide/Energy Star appliance (fridge; dishwasher) Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.