Building permit — Addition / Alteration — 1612 W 3RD AVENUE, Vancouver, BC V6J 1K2

0 visitors / 30 days

Source: Vancouver — Issued permits — 2020-2022

Field Review - Addition / Alteration - Interior alterations only and a change of use from the existing Vehicle Dealer to a new Retail Store on the ground floor with ancillary office on the second floor at 1612 W.

Listed on FolioProjects
2026-11-28
Location
1612 W 3RD AVENUE, Vancouver, BC V6J 1K2
Application number
BP-2021-01841
Source-reported status
Issued

Application status does not establish construction activity or completion.

Share, broadcast and print
Open broadcast feed

Source information and freshness

Vancouver — Issued permits — 2020-2022 · Last checked 2026-11-28T22:10:37.903944+00:00

Checking a source does not confirm that its records reflect current construction or approvals. Meaningful changes appear in Activity.

Original source record

Contains information licensed under the Open Government Licence – Vancouver. Licence

Summary totals updated 2026-11-28 22:22:17.861069+00. Recent changes appear after the next refresh.

Public Broadcast · screens & websites

Shows only publicly available records. Private records are excluded, even when you are signed in.

Launch Broadcast ↗

Municipal application details

Building permit — Addition / Alteration · BP-2021-01841

Field Review - Addition / Alteration - Interior alterations only and a change of use from the existing Vehicle Dealer to a new Retail Store on the ground floor with ancillary office on the second floor at 1612 W. 3rd Avenue at this existing commercial and industrial building. Scope of work: - Install an interior wall between the retail & storage on main fl, new interior door, upgrade new accessible washroom, and converting the boiler room to a storage room on the upper level. Revision #1 - Dec 21, 2021 Reduce scope of work: 1) Cancel voluntary HVAC upgrade for both 1612 and 1614 W. 3rd 2) Retain boiler room and existing kitchenette on the second floor of 1612 W. 3rd OK for field review as per Scott Easby, April 26, 2021. Energy Upgrade: E4 - HVAC - Upgrade Hvac to incorporate Economizers (per 6.5.1 of Ashrae 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. Letters of Assurance Rec'd: Schedule A & Schedule B Architectural submitted per Sharif Senbel, 604-605-6995

Application address
1612 W 3RD AVENUE, Vancouver, BC V6J 1K2
Source-reported status
Issued
Source record created
Issued date

Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.

Source data licence and terms of use ↗

View municipal application ↗

These are municipal application records. Their status and dates do not establish current construction progress. Associated addresses do not establish a verified parcel history.

About this project

Permit value (CAD): 50000.00

Type of work: Addition / Alteration

Permit category: Renovation - Commercial/ Mixed Use - Lower Complexity

Property use: Retail Uses

Specific use: Retail Store

Area: Fairview

Permit issued: 2021-07-27

Permit number created: 2021-04-26

HueFlux feedback

Recorded project feedback. These responses do not establish property condition or represent the whole community.

No feedback yet

Share your view using the controls below.

Positive feedback
Negative feedback

Project polls

Answer specific questions about this project and view the results the owner chooses to share.

View project polls

Poll answers are measured separately from HueFlux feedback.

References

No reference links have been added.

Focus areas

No focus areas have been added.

Comments

New comments are public while this project is public. Earlier members-only comments remain restricted.

Sign in to comment.

No comments on this page.