Building permit — Addition / Alteration · BP-2021-04901
Field Review - Addition / Alteration - #7B Interior alterations to provide tenant improvements to Unit 7B on the seventh floor in this existing multiple dwelling building on this site. Scope of Work: Renovate the entire unit with new finishes and fixtures. E2 - HVAC - Install Energy Star rated exhaust fan in all Washrooms to suit in-place duct work OK for Field Review as per J.Bal - Nov 17/21 Note to applicant: The services of a structural engineer may be required, based upon site inspection by the District Building Inspector. A Sprinkler permit may be required, as determined by the District Building Inspector. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related Trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Source: Vancouver — Issued permits — 2020-2022. Contains information licensed under the Open Government Licence – Vancouver.
Comments
New comments are public while this project is public. Earlier members-only comments remain restricted.
Sign in to comment.
No comments on this page.